/
/
/
What points should be paid attention to in the construction of mandrel vibrating cement pipe machine in summer

What points should be paid attention to in the construction of mandrel vibrating cement pipe machine in summer

(Summary description)The operation of the mandrel vibrating cement pipe machine in summer needs to pay attention to the fact that the concrete is simply limited by mixing. What points should be paid attention to in the construction of the cement pipe machine in summer:

What points should be paid attention to in the construction of mandrel vibrating cement pipe machine in summer

(Summary description)The operation of the mandrel vibrating cement pipe machine in summer needs to pay attention to the fact that the concrete is simply limited by mixing. What points should be paid attention to in the construction of the cement pipe machine in summer:

Information

  The operation of the mandrel vibrating cement pipe machine in summer needs to pay attention to the fact that the concrete is simply limited by mixing. What points should be paid attention to in the construction of the cement pipe machine in summer:

  1. The concrete strength shall not be lower than C40, and the concrete strength shall not be lower than C50.

  2. For concrete materials, concrete cannot be placed for a long time when the ambient temperature is higher than 30°C. The concrete placement time is 45 minutes, and when the ambient temperature is 20-30°C, the placement time is 60 minutes.

Scan the QR code to read on your phone

Related Reading

contact Us

Add: No. 4, Bangwei Road, Longchuan Industrial Park, Jiangdu District, Yangzhou City, Jiangsu Province

Hotline:0514-8652888886529999
               
0514-8653888886539999  
Mobil:
13901452222 (Mrs. shuai)

E-mail: bwjx0514@163.com
Website: www.bwjx.com

Bangwei

Mobile Website

Copyright:Jiangsu Bangwei Machinery Manufacturing Co., Ltd    SEO    Power by:www.300.cn    Business License