News Center
We have poured out a vast world of our own with diligence, sweat, and wisdom, reaping the joy of harvest and achieving leap after leap
-
The post-maintenance of the mandrel vibration tube making machine is also very importantTime of issue : 2022- 06-22
The post-maintenance of the mandrel vibration tube making machine is also very important, especially the early maintenance after the tube is formed. Hard dry concrete has low water content and low flow rate.
-
Required working conditions for mandrel vibrating pipe making machineTime of issue : 2022- 06-22
When the billet has plastic deformation in the mandrel vibrating tube manufacturer, it flows and slides along the surface of the cavity, resulting in severe friction between the cavity surface and the billet, causing the mold to fail due to wear. Therefore, the wear resistance of the material is one of the basic and important properties of the mold.
-
The performance index of cement pipe making equipment is also inextricably related to the quality of cement pipe formingTime of issue : 2022- 06-22
The equipment often used in the production of cement pipes is the cement pipe mold. In addition to the materials used, the various performance indicators of the cement pipe mold are also inextricably related to the quality of the cement pipe. At least in a few ways.
-
Why is the production of cement pipe mold deformed?Time of issue : 2022- 06-22
Since the reform and opening up. Other forms of cement pipe mold manufacturers, including collective enterprises, joint ventures, sole proprietorships and private enterprises, have been developed. What I will introduce to you is the reason for the deformation of the cement pipe making machine during production.
-
Features of cement tube mill for cement tube making equipmentTime of issue : 2022- 06-22
Cement tube mill is one of the cement tube making equipment. It is a new product after improvement and technological innovation on the basis of traditional ball mill. Its output has been greatly increased and the grinding is fine. Let me introduce cement Features of the tube mill.
-
How do we solve the common faults of cement culvert machinery?Time of issue : 2022- 06-22
Cement culvert machinery is suitable for the forming and production of water and drainage pipes, and has the advantages of reasonable structure, excellent performance and high output. No matter how good the product is, if it is not used and maintained properly, it will fail. When the cement culvert machinery fails, how can we solve it? Let's find out together:
-
Application and Treatment of Radial Extrusion Pipe Making EquipmentTime of issue : 2022- 06-17
According to the production process and equipment operation manual and relevant regulations of this industry, the user unit should formulate the processing rules and operating procedures of the radial extrusion limiting pipe machine and strictly implement them.
-
What points should be paid attention to in the construction of mandrel vibrating cement pipe machine in summerTime of issue : 2022- 06-17
The operation of the mandrel vibrating cement pipe machine in summer needs to pay attention to the fact that the concrete is simply limited by mixing. What points should be paid attention to in the construction of the cement pipe machine in summer:
-
Manufacturing process of high frequency vibration tube making machineTime of issue : 2022- 06-17
The fully automatic production of small and medium-diameter drainage pipes (except for the production of steel cages) mainly includes concrete mixing, feeding, inner mold vibration forming, nozzle rolling forming, inner mold removal, outer mold removal, electric consignment, curing (natural curing or low temperature curing) maintenance), take off the bottom pallet, turn over the pipe (horizontal placement), and transport it out of the workshop to the yard.
-
Construction scheme of prefabricated reinforced concrete assembly type inspection wellTime of issue : 2022- 06-17
The construction process of the prefabricated reinforced concrete assembly inspection well is as follows: construction preparation → foundation pit excavation → foundation treatment and cushion laying → inspection well installation → pipeline and inspection well connection → launder construction → pavement well ring and well cover installation → backfilling → acceptance .
contact Us
Add: No. 4, Bangwei Road, Longchuan Industrial Park, Jiangdu District, Yangzhou City, Jiangsu Province
Hotline:0514-86528888、86529999、
0514-86538888、86539999
Mobil: 13901452222 (Mrs. shuai)
E-mail: bwjx0514@163.com
Website: www.bwjx.com
Mobile Website
Copyright:Jiangsu Bangwei Machinery Manufacturing Co., Ltd SEO Power by:www.300.cn Business License